| Progress is evident in this overview of the structure, taken from the driveway. Many more courses of logs have gone up and third floor window openings are now clearly visible.
Today Dr. Ellen walked around the structure to show views that haven't been seen before. The electricians also arrived to install the first phase of wiring between floors. |
![]() |
![]() A peek from afar...gives you a kind of cozy feeling, doesn't it? |
![]() |
![]() This is eventually going to be the front (and only) entry into the house. You will enter a foyer here to take either the elevator (on the left) or stairs on the right. There will eventually be a roof structure extending 12 ft out from the house to protect the entryway. The concrete pillars to the right, which also wrap around the mountain side of the house, are supports for decking at the second level. These pillars will be covered with stonework, then 8-inch round logs will extend from there to the decking itself. |
![]() Bill has formed in the first three steps to humor Dr. Ellen |
![]() |
![]() |
![]() |
![]() |
![]() The electrician by now has installed wiring in the subflooring between the second and third floors. The subflooring of the 3rd level cannot be put down until this job is done. |
![]() |
![]() |
![]() |
| This site is copyright-protected. The images, text and style of this site are licensed for viewing on your computer through your Internet browser during your visit. No rights to down load, save, copy, print, redistribute or use in any other manner or method are allowed or implied without the prior written consent of the copyright owner. Any unauthorized use of the images and literary content herein will be prosecuted under federal and international copyright laws.
© EKR Publications. ALL RIGHTS RESERVED. |
EKR Publications • 257 N. Calderwood Street #356 • Alcoa, TN 37701-2111
Telephone: +1.727.517.2767
Toll Free Fax Inqueries: +1.866.790.0417
email
|
|