ICF Forms
Part III - Braces and Supports


Once all the braces and the OSB (strand board) is in place, the ICF walls are ready for the concrete to be poured down into them. The following images help tell the story of what is involved in this process.

Read more about Reward's flat wall iForm™ Insulated concrete forms (ICFs)




These braces have to be installed first before any concrete is poured. The wooden planks allow the crew to stand near the top of the wall to be able to pour the concrete as needed.


A closeup view of one of the braces.



A view of deadmen in support of the vertical walls on the downhill side of the garage structure.




Deadmen stretch the full length of a retaining wall on the East (downhill) side of the house.




Lesley find yet another opportunity to get an overview...!




Cool, huh?



Log Blog Directory



Visit Dr. Ellen's Portfolio Site




















Copyright Notice
This site is copyright-protected. The images, text and style of this site are licensed for viewing on your computer through your Internet browser during your visit. No rights to down load, save, copy, print, redistribute or use in any other manner or method are allowed or implied without the prior written consent of the copyright owner. Any unauthorized use of the images and literary content herein will be prosecuted under federal and international copyright laws.

© EKR Publications. ALL RIGHTS RESERVED.




EKR Publications • 257 N. Calderwood Street #356 • Alcoa, TN 37701-2111
Telephone: +1.727.517.2767
Toll Free Fax Inqueries: +1.866.790.0417

email